Autumn light on a modest brick home with a covered porch, concrete walk and golden maple foliage.

Why Russell Springs City Park Goes Quiet Before It Lights Up

For the past few years, Russell Springs City Park has followed a seasonal cycle. Summer belongs to the pool. In fall the city closes the park to everyone, and in winter it reopens as a drive-through light show that brings thousands of cars down the same lanes where people walk dogs in July. In 2026 a third piece is going in. A nine-hole, par-three golf course is under construction on land next to the park, and it gives the park a use that doesn't depend on the pool or the holidays.

The Gate Closes Before the Lights Go On

Over the last two years, the quietest stretch at City Park has been late fall. In October 2025, Laker Country reported that the park would close on Monday, October 20, so city workers could start building the drive-through light display. In the same report, Mayor Eddie Thomas said the closure was a safety precaution. The year before, the station reported on November 15, 2024 that the park was already closed for setup.

Last year's closure lasted a little over five weeks, from October 20 to the November 28 opening. As of October 12, 2026, the local coverage we reviewed had not announced a closure date for this year. The October 2025 date is a guide to the usual timing, not a promise. If your weekday routine includes the walking trail or The Bark, the dog park, watch Laker Country or the City of Russell Springs over the next few weeks for this year's date.

What Those Five Weeks Pay For

Lights at the Park is young. A January 2024 report from Laker Country called the 2023 season the display's second year, so it began in 2022. Two reported counts show how attendance has changed:

Season Cars through the display Source
2023 Nearly 8,500 Laker Country, Nov. 2024
2025 More than 9,200 Laker Country, Jan. 2026

Mayor Thomas told Laker Country that turnout for the 2025 season was higher than in earlier years. The display has also grown. The mayor said five or six new scenes were added for 2024. In January 2026 he said the city wants to add a couple more when the lights return in November.

The season has gotten longer, too. In 2024 the display ran through December 29, from 5 to 8 p.m. Sunday through Thursday and 5 to 10 p.m. on Fridays and Saturdays. For 2025 to 2026 the hours stayed the same, and the city extended the run through Sunday, January 4. The Russell County Newspapers reported in 2024 that admission was free and donations were accepted. Hours, end date and admission for 2026 have not been announced yet, so treat these as last year's numbers.

Main Street Sets the Opening Night

The lights have opened on parade night in each recent year, which makes Main Street's fall calendar part of the park's calendar. Here is the sequence, with 2026 dates where they've been confirmed:

  1. The Springs Cruise In and Car Show, Saturday, October 17, 1 to 4 p.m., Main Street. The Lake Cumberland Tourism listing describes the May through October series as including music, food and a 50/50 drawing, and this date is listed as part of it.
  2. Trunk or Treat, Saturday, October 31, 5 to 7 p.m., Main Street. At the October 8 council meeting, Laker Country reported, Mayor Thomas set trick-or-treating for those hours and encouraged businesses, churches, civic groups and residents to join the Main Street event.
  3. Christmas Parade, Saturday evening, November 28. The council coverage confirms the date. The tourism listing gives 5 to 8 p.m. at 487 Main Street. Last year the lights opened right after the parade, which also fell on November 28. A 2026 opening date for the lights had not been announced as of this writing.
  4. Annual Grinch Event, December 3 and 4, 4 to 9 p.m., 650 S. Highway 127. The Lake Cumberland Tourist Commission lists ice skating, food trucks and vendors.

On this calendar, the park's closure and Main Street's busiest weeks overlap. While the trail is closed, the downtown events carry the fall, and then the parade hands off to the park.

The Park Is Being Rebuilt While It Hosts

This year the light display will share the park with a construction project. In July, Laker Country reported that Mayor Thomas and the city council had announced a nine-hole, par-three course at City Park. The project costs about $410,000, split between a $205,000 federal grant and a $205,000 state grant. According to Thomas, the idea came after the city cleared land next to the park several years ago. City officials then talked with communities in other states that had built par-three courses. Plans include a pro shop with men's and women's restrooms reachable from outside, air conditioning, televisions and gathering space for golfers and other park visitors.

By the August 13 council meeting, Russell County Online reported that work on the course was underway. Utility hookups for the new restrooms were set for the following week, and crews would move to the pro shop after that. We found no later status report. No opening date, course name or fee schedule has been published, and the October council coverage didn't mention the course.

The course is the latest of several 2026 additions. In May the city held a ceremonial opening for Bankers Field of Dreams, a renovated ballfield meant to make play easier for children with special needs. In August, Laker Country passed along a Kentucky League of Cities feature describing the field's wheelchair-accessible dugouts, soft turf and bases built into the playing surface. At the Joseph Smith Hayes Memorial Pool, admission this summer was $5, free for children three and under, with a $35 season pass. In August the pool manager reported extended splash pad hours and strong night-swim turnout.

The pool fills the park in summer and the lights fill it in winter. A golf course is the first major addition here that isn't tied to either of those seasons.

The Rest of the Park, Until the Gate Closes

For now, the regular park is open. The Kentucky Tourism listing names playgrounds, tennis courts, walking and hiking trails, a skateboard park and The Bark, a fenced dog park. That listing has no date, so confirm the details if you're planning around a specific feature.

The city's planning goes beyond the park's fence, too. At the same August meeting, the council unanimously adopted the 2026 Jamestown and Russell Springs Active Living Walk and Bike Master Plan. It was developed with the Kentucky Department for Public Health, and council members described it as a non-binding guide for walking and cycling safety and connections. Closer to home, the city recently blacktopped several streets with $119,000 in state funding, and more paving is on the schedule.

To catch the trail, the tennis courts or an afternoon at The Bark before setup begins, the next week or so is the safest window based on last year's October 20 closure.

If you're weighing a home near the park, near Main Street or somewhere else in Russell County, and you want to know how places like City Park fit into your daily routine, The Millie Weaver Team can walk you through it at your own pace. When you're ready, schedule a consultation.

Partner With Our Expert Team

Bringing together a team with the passion, dedication, and resources to help our clients reach their buying and selling goals. With you every step of the way. Contact us today to find out how we can be of assistance to you!

Follow Me on Instagram